• Opry Mills Aquarium, Nashville, TN

• Adventure Aquarium, Camden, NJ

• Mote Marine Aquarium, Sarasota, FL

• Cameron Park Zoo, Waco, TX - Stream Features

• Hogle Zoo, Salt Lake City, UT - Elephant Exhibit Expansion

• Houston Zoo - Natural Wonders Exhibit

• Santa Barbara Zoo, CA - New Elephant + Turtle Pools

• Marineland, St. Augustine, FL - Dolphin Tanks

AQUAFIN-2K/M JOB REPORT

2K/M was used to construct a large temporary pool which was flooded for one of the action scenes
Picture 1: View of pool layout

Picture 6 - Sealing floor - wall joint: Working J.S. TAPE-2000 into fresh AQUAFIN 2K/M base coat

Picture 10: Pool floor - Installing AQUAFIN-2K/M
Picture 12: Pool filled with water, ready for filming
Project Reference 2003:
1.) Mechanical rooms:
Secondary water containment installation of 105,000 ft2
(9'700 m2) AQUAFIN-2K/M with 2K-FABRIC, and 6,000 ft
(1'800 m) JOINT SEALING TAPE-2000.

2.) Pentagon Athletic Center:
Waterproofing of 4,700 ft2 (430 m2)  25 m x 12.5 m six-lane,
Olympic-size, tiled swimming pool.

Productos/Imper./Cementicios y Elastomericos/Ejemplos de Trabajos

Siguiente--------->